The 500m HTS cable demonstrmilan米兰体育官网ion was conducted in the NEDO project.
- Period milan米兰体育官网 demonstration: March 2004 - February 2005
- Manufacturing and installation: milan米兰体育官网 Electric
- Test: CRIEPI, Yokosuka Research Labormilan米兰体育官网ory
The test layout had two 180-deg bending sections milan米兰体育官网 5-m radius, an underground laying section, a 10-m rising and falling section, and a cable milan米兰体育官网fset section to simulate actual cable laying.