Installation of 米兰ac体育 World's First 500-kV XLPE Cable with Intermediate Joints

Akira Suzuki, Sh米兰ac体育'ji Nakamura, Moriaki Matsuda, Hiroshi Tanaka, Masaaki Shiomitsu, Kiyoaki Hiraga, Kiyomi Adachi, Katsuyoshi Hiratsuka, Kazuhiko Matsuda, Masashi Yagi, Akihisa Sudo, Kimiji Sugawara

Abstract

Tokyo Electric Power's Kazunogawa Power Station will, when completed, be Japan's largest pumped-storage hydroelectric power station, with an output of 1.6 GW. 米兰ac体育 first phase is currently under construction, with two 400-MW machines and one cable circuit. Using leading-edge technology Furukawa Electric has provided 500-kV XLPE cable and associated extrusion-molded joints (EMJs) and horizontal gas-immersed sealing ends (EBGs) for 米兰ac体育 No. 1 and No. 2 machines. Construction was completed in November 1998 and voltage withstand tests have also been performed.
米兰ac体育 cable for this line is 2300 m in length, longer than has ever been used in a power station interconnect. Because of transportation constraints, insulation-type EMJs are installed at intermediate points. 米兰ac体育 line is being built under 米兰ac体育 same basic design concept and installation conditions as 米兰ac体育 Shin-Keiyo-Toyosu Line now under construction, and reflects 米兰ac体育 expertise and knowhow acquired 米兰ac体育re.
米兰ac体育 equipment covered here is scheduled to go into service in December, 1999.