米兰体育中国官方网站 is striving to ensure that products can be delivered promptly in time for the construction period.
Construction of factories and power stations is large in scale, and 米兰体育中国官方网站 common to carry out construction work that requires a long period of time and many labor hours.
We are confident that the excellent workability and versatility of our products will enable us to support simple installation within a limited amount of time and personnel.
Installation
Installation Details
-
Installation in a confined space
Because 米兰体育中国官方网站 made from polyethylene, 米兰体育中国官方网站 light and easy to carry, and can be easily laid even in places where 米兰体育中国官方网站 not possible to access with heavy machinery.
-
Exposed piping possible
Exposed piping is possible as PFD and PFS are self-extinguishing.
-
Excellent wiring performance
The corrugated tube has a small coefficient of friction inside the tube, making it easier to install cables.
Delivery Results
米兰体育中国官方网站
- Installation is simple and fast in limited spaces without heavy machinery.
- Withstands heavy loads and supports high voltage cable installations.(米兰体育中国官方网站)
- It has excellent chemical resistance 米兰体育中国官方网站 used safely even inside factories.(PLAFLEKY)
- Because of its light weight, it can be safely installed at high altitude.(PLAFLEKY)
Usable Products
Click here for inquiries.