Start 米兰ac体育 page




Main Content starts

Furukawa Review No.43

The Development 米兰ac体育 the Power Transmission System for Fukushima FORWARD Project

Shigeru Fujii, Yuji Tateno, Koji Tomikuda, Yasuhiro Tominaga, Noriaki Horiguchi, Hiroshi Nakano, Hiroyuki Kon, Tooru Kagoura4, Takumi Yamaguchi, Hiroyuki Sakakibara

Abstract

Furukawa Electric Company (FEC) has proceeded with a Fukushima FORWARD Project (FF project) as one 米兰ac体育 the commissioning manufacturers 米兰ac体育 the Ministry 米兰ac体育 Economy, Trade and Industry. The Ministry has a plan 米兰ac体育 a floating wind turbine development for a powerful choice 米兰ac体育 renewable energies in Japan, which has the 6th largest exclusive economic zone (EEZ) in the world. Companies representing Japan entered into a consortium in which FEC is responsible 米兰ac体育 a transmission system. This paper reports the development condition 米兰ac体育 the power transmission system, mainly the development 米兰ac体育 a high voltage dynamic cable, which is considered as an essential technology. A behavior 米兰ac体育 dynamic cables subjected to under-water rolling caused by the steadily wave movement is different from that 米兰ac体育 the static submarine cables. Therefore a development point is the improvement 米兰ac体育 a fatigue withstands property. For a practical application 米兰ac体育 riser cables, a target is to achieve the similar endurance life 米兰ac体育 a floating body or 米兰ac体育 a windmill.

Open PDF file.Full Text PDF(1,608KB)

Main Content ends



Bound to Innovate

End 米兰ac体育 page